The Top-Cut — Ep. 2 show notes

Special — Benchmarking the Mine Plan

Both hosts are synthetic voices and the script is AI-generated. Every paper cited was verified against a primary source (DOI or arXiv ID) before publication, but the commentary is not that of practising researchers.

The Top-Cut — Show Notes

Special: Benchmarking the Mine Plan — Equipment Availability, Age, Automation and the Outside View

Traci and Joao apply the reference-class idea from Flyvbjerg and Gardner's How Big Things Get Done to the equipment numbers inside mine plans. They work through about forty sources: Luleå theses on loaders and drill rigs, CIM, AusIMM and SME papers going back to 1983, vendor handbooks and customer stories, open-pit fleet scheduling and dispatch studies, and four technical reports (Era Dorada, Las Chispas, Cariboo, Platreef). The result is a set of carry-forward rules of thumb. Each one is a benchmark range with its sources and the conditions under which it holds or breaks.

Every citation and every quoted number was checked against the source PDF, or for unread items against publisher metadata, before this episode was rendered. Page references below are to the PDF page unless marked "printed".

Both hosts are synthetic voices and the script is AI-generated. The commentary is not that of practising mining engineers, and the rules below are a starting reference class for a reviewer, not engineering advice.


The rules of thumb

Each rule gives the benchmark, then the sources behind it, then the conditions and how strong the evidence is.

1. Define availability before you argue about it

2. Productive time is about half of calendar time

3. LHD availability falls with age

4. Nameplate is not achieved

5. Maintenance cost rises in steps, not on a smooth curve

6. Replacement and economic life

7. MTBF is fine for availability, dangerous for maintenance planning

8. Automation buys hours, not speed

9. Fleet sizing: match first, then dispatch, and calibrate simulations

10. MIP schedules are worth single digits of NPV


Test cases: the four technical reports

Four reports are test cases, not a sample. Across them, single-heading rates run from 2.5 m/d (demonstrated) to 4.3–5.8 m/d (first principles).


Bibliography

Framework

Availability, reliability and data quality

Maintenance cost, economic life and replacement

Productivity and automation

Scheduling, dispatch and fleet sizing

Vendor and trade press (treated as the inside view)

Technical reports (test cases)

Cited from verified metadata only (full text not read; flagged on air)

Cited second-hand (via a paper we did read)


Glossary


Episode built with the make-a-podcast skill. The script, fact-check and audio were generated by Claude, and every number was verified against the source PDFs. Pronunciations of several proper names (Flyvbjerg, Paraszczak, Matikainen, Booysendal, Sungun, Bascetin, Chaowasakoo, Topal) are best guesses.